December 2022 (in English)
Size: 108 pages
Content includes:
Preface- Strenghtening Military Mobility (Dr. Thomas Kauffmann, Managing Director and Vice President GDELS International Business & Services)
- We Enable Mobility (Dr. Christian Kauth, Managing Director and Vice President, GDELS–Bridge Systems)
- „Aluminium is the best combination of the disadvantages of all possible materials.“ Interview with Dr. Christian Kauth, GDELS–Bridge Systems
- Building Bridges over the Centuries. Continuities and technical change: from antiquity to today, engineers master similar challenges (Andreas Himmelsbach)
- 70 Years of Experience in the Construction of Amphibious Bridge Systems (GDELS–Bridge Systems)
- Military Mobility and Interoperability from an EU-NATO perspective (Lieutenant Colonel Holger Poeppe)
- Solutions for NATO’s Current and Future Gap Crossing Capability
- The CEPA Project “Military Mobility” Interview with Lieutenant General (ret.) Ben Hodges, Senior Advisor Human Rights First
- Rail Loading Ramps (GDELS–Bridge Systems)
- Interoperability of Floating Bridge Systems (GDELS–Bridge Systems)
- GDELS’ Bridging Helps Underpin UK, NATO Mobility and Interoperability (Tim Guest)
- The German/British Amphibious Engineer Battalion 130 (Lieutenant Mario Kissel)
- Establishment of the German/British Amphibious Engineer Battalion 130 Minden 30.09.2021 (Lieutenant General Alfons Mais, Chief of the German Army)
- Military Mobility – Core Element of a Credible NATO Strategy (Lieutenant General (ret.) Heinrich Braus)
- The Floating Bridge Family IRB-M3-HYDRA (GDELS–Bridge Systems)
- Evolution of the Amphibian M3. How constant development has kept the M3 amphibious bridge and ferry system up-to-date over the decades (GDELS–Bridge Systems)
- A New Approach to Mobility (GDELS–Bridge Systems)
- Flexibility Follows Function (GDELS–Bridge Systems)
- Use of VIPER Bridge System by the U.S. Marine Corps (GDELS–Bridge Systems)
- MAMBA – The All-Rounder (GDELS–Bridge Systems)
- Testing the limits of the Improved Ribbon Bridge (Carol C. Coleman)
- GDELS–BS – the Partner for High Military Load Class Equipment (GDELS–Bridge Systems)
- Building Bridges and Interoperability in a Strong Europe. River-Crossing Operations during
- Exercise Anakonda 16 (Major James M. Kadel and Captain Olufemi O. Apata)
- Wet Gap Crossing. Keys to success, doctrine, principles and Tactics, Techniques, and Procedures from inside a Multi-Role Bridge Company (1st Lt Taylor M. Ross and Cpt Russell L. Bettencourt)
- Future of Gap Crossing in the Royal Netherlands Army (Captain Elmar J. Hoogterp)
- Medium Gap Crossing (Captain Elmar J. Hoogterp)
- M3 Meets Swedish Requirements for Cold Weather Operations (Erik Wistedt)
- Operational in Iraq with GDELS’ Bridging (Tim Guest)
- The MAMBA in Service with the Austrian Armed Forces (Lieutenant Colonel Stefan Schulz)
- Mobility Support Equipment for the Republic of Korea Armed Forces (Hanwha Defense)
- Future Strategy of Engineer Operations for Water and Dry Obstacles – from the Perspective of the German Army Corps of Engineers (Lieutenant Colonel Michael Frick and Captain Torsten Patzak)
- Floods: Involving the Bundeswehr in Disaster Management (Juliane Thümmel)
- Disaster Protection Deployment of Military Bridges in the Bundeswehr (GDELS–Bridge Systems)
- The Amphibious Bridge and Ferry System M3 has proven itself in numerous missions. Interview with Colonel Jorg Busch, German Army Engineer School
- Quality Assurance at General Dynamics European Land Systems-Bridge Systems (GDELS–Bridge Systems)
- How do we learn in the future? About the future of learning from a technical and didactic point of view (Dr. Uwe Katzky and Klaus Bock-Müller)
- Welding like Professionals. The General Dynamics European Land Systems-Bridge Systems
- Welding Centre (GDELS–Bridge Systems)
- PoBo Development Project. „Development of an Improved, Multifunctional Pontoon Boat“ (GDELS–Bridge Systems)
- General Dynamics European Land Systems presents Pontoon Boat in Hamburg (GDELS–Bridge Systems)
- Autonomously Operating Reconnaissance Unit – BASILISK (GDELS–Bridge Systems)
- Civilian Bridges for Disaster Control and Construction (GDELS–Bridge Systems)
- GDELS participated in the NATO event Wide Wet Gap Crossing (WWGC) in Ingolstadt (Germany) (GDELS–Bridge Systems)
Customers who bought this product also bought the following products:
Land Mobility14,80 EUR (7 % VAT incl. excl. Shipping costs) | |
Advanced Technologies for German Land Forces 202214,80 EUR (7 % VAT incl. excl. Shipping costs) | |